Building of Control CCS of the Outer Harbour of Ferrol

As the prow of a ship ready to weigh anchor and set sail, on the hammer of the main dock of the Outer Harbour of Ferrol, opened to the views of the estuary. The aims: uniqueness and presence, functionality and flexibility, "intelligent" and "high-tech" building; economy and easy maintenance.

Project
Multipurpose Building for the Port Authority and Control of the Outer Harbour of Ferrol in colaboration with Antonio Desmonts Sierra
Client
Port Authority of Ferrol-San Ciprián
Surveyor
Fernando Bores
Jose Salas
Constructor
Dragados
Date
2010
Area
2130 m²
Back